Device status document
From SarahConnor
Revision as of 03:18, 30 October 2011 (edit) ERawls81 (Talk | contribs) m (Removed broken links.) ← Previous diff |
Current revision (02:16, 28 April 2012) (edit) (undo) Thebruce (Talk | contribs) m (Reverted edits by ERawls81 (Talk); changed back to last version by Thebruce) |
||
Line 22: | Line 22: | ||
- | Dr. Bentley's exploratory reverse-engineering quickly began to yield results in tachyon collection <span class="plainlinks">[http://www.cashhhh.com <span style="color:black;font-weight:normal;text-decoration:none!important;background:none!important; text-decoration:none;">payday loans online</span>]</span> and was approved in an emergency quorum of the Board to establish EniTech Research Laboratories as the officially supported project for this calendar year. Our standard backing has allowed them to significantly increase the size and staff of their research facility and we expect them to reach their proposed target of an operational prototype by early next year. | + | Dr. Bentley's exploratory reverse-engineering quickly began to yield results in tachyon collection and was approved in an emergency quorum of the Board to establish EniTech Research Laboratories as the officially supported project for this calendar year. Our standard backing has allowed them to significantly increase the size and staff of their research facility and we expect them to reach their proposed target of an operational prototype by early next year. |
|} | |} |
Current revision
[edit] Enitech Device Status Document
- Dyson Trust reports on the status of the accepted project for Enitech for 2007, written June 1st, 2007.
- It was discovered on the Dysontrust.org/Secure section, using Anna's login.
|